01Fit-outWorkplace
A trading floor that had to stay quiet
Vantage Analytics · Olympia Tech Park, Guindy
12,400 sq ft
2025
Interior design & build · Chennai · Est. 2014
We design and build commercial interiors across Chennai — and we manufacture the kitchens and wardrobes ourselves, in our own workshop, to a millimetre.
Plate 01 · Indicative floor plate. Circulation route in red.
Drawn in-house
01What we do
Most studios either draw and hand the build to somebody else, or build without ever drawing. We do both — and the two halves keep each other honest: the fit-out side holds the workshop to deadlines, and the workshop holds the drawings to what can actually be made.
01Commercial fit-out
Workplaces, clinics, retail and restaurants — from measured survey to handover file.
We take a bare shell or a tired floor plate and give you back a working space, with the drawings and the paperwork to prove how it was built. One team holds the design, the services coordination and the site. Your facilities manager gets a handover file, not a shrug.
Typical size
1,000 – 25,000 sq ft
02Modular kitchen & wardrobe
Designed here, cut and assembled in our Thirumudivakkam workshop, installed by our own crew.
Nothing is subcontracted to a nameless factory. Panels are CNC-cut from BWP ply or HDHMR to a ±1 mm tolerance, edge-banded in-house, and dry-assembled on the workshop floor before anything reaches your flat. You can walk in and look at your own carcasses mid-build.
Manufacturing tolerance
± 1 mm
02Selected work
Every case study leads with the constraint rather than the styling — the beam in the wrong place, the slab we weren't allowed to cut, the floor that had to open for business before it was finished.
03What you receive
The most common complaint we hear about a previous contractor is that nothing was written down. Here is the paperwork that comes with every fit-out, listed so you can hold us to it.
01
02
03
04
05
04How it runs
01
We survey the site ourselves. No relying on the builder's plan.
3–5 days
02
Two or three plan options, then one developed properly.
2–3 weeks
03
A drawing set and an itemised BOQ. The number stops moving here.
1 week
04
Workshop and site run in parallel. You get a report every Friday.
4–10 weeks
05
Snag list closed in writing, then we come back at 90 days.
1 week + 90 days
05The workshop
Fourteen thousand square feet at Thirumudivakkam: panel saw, edge-bander, CNC router and a dust-free spray booth. Nothing is pushed out to an anonymous factory in the name of a lower rate.
Plate 02 · Joinery elevation. Dimension chains at both axes.
A 30-minute call, then a site visit if it's worth one. We'll tell you what it costs and how long it takes before you commit to anything.